Bidwell has numerous current contracts focused on workplace safety.
Environmental Health & Safety Onsite Consulting Services in Support of Construction Management for:
- NR-COGEN-CM – North River WWTP Cogeneration and Electrification Project
- TCM-BT-53 – Rondout-West Branch Bypass Tunnel & Repairs to Existing Aqueduct
- TCM-KENS-EAST – Kensico to Eastview Connection Project
- CAT-RR – Catskill Aqueduct Repair and Rehabilitation
- QBT-CM2 – Contract C547A for Shaft 17B-1, Shaft 18B-1 and C547B for Installation of Equipment and Appurtenances
- PS-276-CM – Hannah Street Pump Station Upgrade
- PS-284-CM – Reconstruction of the Clearview Pump Station
- PS-313-CM – Reconstruction of the 235th Street (Riverdale) Pump Station
- CSO-GC-SFS-CM-Rh3-CP2 – Excavation and Below Grade Construction of the RH-034 Combined Sewer Overflow Abatement Facility at the Gowanus Canal
- EE-CM5A – DEP Downstate and Upstate Infrastructure Projects at Various Locations
- DEL-209-DSDC-C – Reconstruction of the Port Jervis Wastewater Treatment Plant
Environmental Health & Safety Design Consulting Services for:
- DB-AE1-SOC – DEP Capital Water and Wastewater Infrastructure Projects
- CSO-GC-SFS-CM-OH-CP1 – Demolition and Site Clearing for the OH-007 Combined Sewer Overflow at the Gowanus Canal
- CSO-FC-DF-DES – Flushing Creek CSO Disinfection Facilities
- QBT-ES-DES – Queens-Brooklynn Tunnel Portion of City Tunnel No. 3 Stage 2
- PW-119-E – Miscellaneous Capital Projects at Various BWT Locations
- PW-119-N – Miscellaneous Capital Projects at Various BWT Locations
- PW-119-S – Miscellaneous Capital Projects at Various BWT Locations
- PW-120-DES-N – Miscellaneous Capital Projects at Various BWT Locations
- PW-120-DES-S – Miscellaneous Capital Projects at Various BWT Locations
- PS-DES-1 – Upgrade of Mersereau Avenue, Mayflower Avenue, and Richmond Avenue Pumping Stations
- PS-DES-2 – Upgrade of DEP Pumping Stations
- PS-DES-3 – Upgrade of Glendale, St. Albans and Howard Beach Pumping Stations
- PS-DES-4 – Upgrade of Little Neck, Linden Place and Park Drive East Pumping Stations
- CAT-213FAC-DES – Reconstruction of the Ashokan Headworks
- CAT-337 – Enhancements for the Treatment of Catskill and Delaware Water Supply Systems
- CAT-427-DES – Poor Farm Arch Phase 2 Stabilization
- CAT-475-DES – High Level Outlet (HLO) Installation at Gilboa Dam and Crest Gate Removal
- CAT-506-DES – Water Supply Resource Recovery Facilities Rotating Biological Contactors Replacements
- CAT-507-DES – Grahamsville, Grand Gorge, Pine Hill and Tannersville Water Supply Resource Recovery Facility Microfiltration Replacement
- CAT-523-DES – Rehabilitation of the Catskill Aqueduct Wallkill Blow-Off Chamber
- EHSM-04 – Environmental Health and Safety Management Services
- CS-NC-BAP-DES – Borden Avenue Pump Station Expansion
- BWS-JOC-18-DES – BWS JOCs Contracts
- BWSO-PCM-LSLRP – NYC Lead Service Line Replacement Program
- HP-238-DES – New Anaerobic Digester Facilities at the Hunts Point WWTP
- PR-138-CM– Port Richmond Wastewater Resource Recovery Facility Headworks Improvements
- TOC-DESCTY-1 – Various In-City DEP Infrastructure Projects
- TOC-DESCTY-2 – Various In-City DEP Infrastructure Projects
- QBT-ES-DES – Queens-Brooklyn Tunnel Portion of City Tunnel No. 3 Stage 2
- TANKS-DES – Final and Primary Settling Tanks Rehabilitation for Wastewater Facilities
- TI-689-CM – Tallman Island Wastewater Resource Recovery Facility Western Cribwall Replacement, Headworks Rehabilitation and Power Distribution Improvements
- CRO-636-DES – Hillview South Connecting Conduit (SCC) Repair
- BB-220-DES – Reconstruction of Emergency Generators and Mail Substation at Bowery Bay Wastewater Resource Recovery Facility
- RLCY-DES-C – Various Wastewater Projects
- 1558-ENGSVC-N – Miscellaneous Projects at Various BWT Locations within Regional Group North
- CAN-HYDRO-DES – Cannonsville Hydroelectric Facilities
- EE-PEDS-24B – DEP Capital Projects
- PS-287-DES-C – Reconstruction of the Eltingville Pump Station
- TOSC4-CM – Various BWSO Capital Contracts
- 26W-144-DES-CM2 – Installation of Centrifuges at 26th Ward Wastewater Resource Recovery Facility
- NR-129-DES – Replacement of the Main Sewage Pumps, Main Sewage Pump Discharge Piping, and Influent Bar Screens at North River Wastewater Resource Recovery Facility
- OH-123-DES – Installation of Gravity Belt Thickeners at Owls Head Wastewater Resource Recovery Facility
- PW-122-E – Miscellaneous Projects at Various BWT Locations
- DEL-359V-DES – Facility Improvements at the Delaware Aqueduct Interconnection Facility at Shaft 4