Bidwell has numerous current contracts focused on workplace safety.

Environmental Health & Safety Onsite Consulting Services in Support of Construction Management for:
workplace safety

  • NR-COGEN-CM – North River WWTP Cogeneration and Electrification Project
  • TCM-BT-53 – Rondout-West Branch Bypass Tunnel & Repairs to Existing Aqueduct
  • TCM-KENS-EAST – Kensico to Eastview Connection Project
  • CAT-RR – Catskill Aqueduct Repair and Rehabilitation
  • QBT-CM2 – Contract C547A for Shaft 17B-1, Shaft 18B-1 and C547B for Installation of Equipment and Appurtenances
  • PS-276-CM – Hannah Street Pump Station Upgrade
  • PS-284-CM –  Reconstruction of the Clearview Pump Station
  • PS-313-CM – Reconstruction of the 235th Street (Riverdale) Pump Station
  • CSO-GC-SFS-CM-Rh3-CP2 – Excavation and Below Grade Construction of the RH-034 Combined Sewer Overflow Abatement Facility at the Gowanus Canal
  • EE-CM5A – DEP Downstate and Upstate Infrastructure Projects at Various Locations
  • DEL-209-DSDC-C – Reconstruction of the Port Jervis Wastewater Treatment Plant

Environmental Health & Safety Design Consulting Services for:

  • DB-AE1-SOC – DEP Capital Water and Wastewater Infrastructure Projects
  • CSO-GC-SFS-CM-OH-CP1 – Demolition and Site Clearing for the OH-007 Combined Sewer Overflow at the Gowanus Canal
  • CSO-FC-DF-DES – Flushing Creek CSO Disinfection Facilities
  • QBT-ES-DES – Queens-Brooklynn Tunnel Portion of City Tunnel No. 3 Stage 2
  • PW-119-E – Miscellaneous Capital Projects at Various BWT Locations
  • PW-119-N – Miscellaneous Capital Projects at Various BWT Locations
  • PW-119-S – Miscellaneous Capital Projects at Various BWT Locations
  • PW-120-DES-N – Miscellaneous Capital Projects at Various BWT Locations
  • PW-120-DES-S – Miscellaneous Capital Projects at Various BWT Locations
  • PS-DES-1 – Upgrade of Mersereau Avenue, Mayflower Avenue, and Richmond Avenue Pumping Stations
  • PS-DES-2 – Upgrade of DEP Pumping Stations
  • PS-DES-3 – Upgrade of Glendale, St. Albans and Howard Beach Pumping Stations
  • PS-DES-4 – Upgrade of Little Neck, Linden Place and Park Drive East Pumping Stations
  • CAT-213FAC-DES – Reconstruction of the Ashokan Headworks
  • CAT-337 – Enhancements for the Treatment of Catskill and Delaware Water Supply Systems
  • CAT-427-DES – Poor Farm Arch Phase 2 Stabilization
  • CAT-475-DES – High Level Outlet (HLO) Installation at Gilboa Dam and Crest Gate Removal
  • CAT-506-DES – Water Supply Resource Recovery Facilities Rotating Biological Contactors Replacements
  • CAT-507-DES – Grahamsville, Grand Gorge, Pine Hill and Tannersville Water Supply Resource Recovery Facility Microfiltration Replacement
  • CAT-523-DESRehabilitation of the Catskill Aqueduct Wallkill Blow-Off Chamber
  • EHSM-04 – Environmental Health and Safety Management Services
  • CS-NC-BAP-DES – Borden Avenue Pump Station Expansion
  • BWS-JOC-18-DES – BWS JOCs Contracts
  • BWSO-PCM-LSLRP – NYC Lead Service Line Replacement Program
  • HP-238-DES – New Anaerobic Digester Facilities at the Hunts Point WWTP
  • PR-138-CM– Port Richmond Wastewater Resource Recovery Facility Headworks Improvements
  • TOC-DESCTY-1 – Various In-City DEP Infrastructure Projects
  • TOC-DESCTY-2 – Various In-City DEP Infrastructure Projects
  • QBT-ES-DES – Queens-Brooklyn Tunnel Portion of City Tunnel No. 3 Stage 2
  • TANKS-DES – Final and Primary Settling Tanks Rehabilitation for Wastewater Facilities
  • TI-689-CM – Tallman Island Wastewater Resource Recovery Facility Western Cribwall Replacement, Headworks Rehabilitation and Power Distribution Improvements
  • CRO-636-DES – Hillview South Connecting Conduit (SCC) Repair
  • BB-220-DES – Reconstruction of Emergency Generators and Mail Substation at Bowery Bay Wastewater Resource Recovery Facility
  • RLCY-DES-C – Various Wastewater Projects
  • 1558-ENGSVC-N – Miscellaneous Projects at Various BWT Locations within Regional Group North
  • CAN-HYDRO-DES – Cannonsville Hydroelectric Facilities
  • EE-PEDS-24B – DEP Capital Projects
  • PS-287-DES-C – Reconstruction of the Eltingville Pump Station
  • TOSC4-CM – Various BWSO Capital Contracts
  • 26W-144-DES-CM2 – Installation of Centrifuges at 26th Ward Wastewater Resource Recovery Facility
  • NR-129-DES – Replacement of the Main Sewage Pumps, Main Sewage Pump Discharge Piping, and Influent Bar Screens at North River Wastewater Resource Recovery Facility
  • OH-123-DES – Installation of Gravity Belt Thickeners at Owls Head Wastewater Resource Recovery Facility
  • PW-122-E – Miscellaneous Projects at Various BWT Locations
  • DEL-359V-DES – Facility Improvements at the Delaware Aqueduct Interconnection Facility at Shaft 4